Project: New Valley Hospital
Location: 650 Winters Ave Paramus, NJ 07652
Type: Hospital
Interstate Drywall worked on floors 1-7 and the roof, which included patient rooms and common areas, at New Valley Hospital. Interstate Drywall’s scope of work consisted of sheetrock, ceilings, tape & spackle, framing, doors, frames & hardware and headwalls throughout the hospital. With the opening of a state-of-the-art hospital on a brand-new campus in Paramus in April of 2024, The Valley Hospital in Paramus will provide an even better experience for patients and their families with 370 single-patient rooms and a flexible facility design to enhance patient privacy, safety, and comfort.